User`s guide
Installation and Setup
56
Figure 7 Bend Dimensions for Connecting the ATD/TD Transfer
Line to an AutoSystem GC or Clarus 500 GC
4. Remove the cap from the GC injector port. Refer to the
GC manual for details.
5. Working from the top of the GC, insert the GC end of
the transfer line through the hole in the oven wall and
into the oven.
6. When the stainless steel tube retainer has emerged into
the oven and further movement is prevented by the
silicone insulation, secure the transfer line in position.
Insert the silicone insulation into the cutout on the outer
panel of the GC to secure the transfer line.
9 cm
Straight
Length
50 cm
Straight
Length
Fused Silica
Transfer Line
Silicone Foam
Rubber Tube
Aluminum sleeve
Add Stainless Steel Sleeve
78 cm Between
Center Lines
ATD
End
GC
End










