User`s guide
Installation and Setup
54
back of the oven outer wall should be visible. See
Figure 9.
6. Remove both of the PVC end caps from the oven entry
insulation (comprising L427-1103, L427 1104, L427-
1144, 0497-3923).
7. Use a knife to cut a hole in the insulation between the
oven liner and the outer wall of the oven. The diameter
of the hole should be equal in size to the outer diameter
to the transfer line assembly. Remove and discard the
insulating material.
8. Install the oven entry insulation at the GC end of the
transfer line.
9. Working from the rear of the GC, insert the GC end of
the transfer line through the hole in the oven wall and
into the oven.
10. When the stainless steel tube retainer has emerged into
the oven and further movement is prevented by the
retainer, lock the transfer line in position (from inside
the oven) using the hairpin cotter (P/N 0992-3058).
11. Gently bend the exposed end of the stainless steel sleeve
inside the GC oven so that it points toward the oven
floor. See Figure 9.
12. Taking care that the transfer line sleeve makes close
contact with the oven insulation, clamp the transfer line
to the strap across the rear of the AutoSystem XL or
Clarus 500 GC using the tie strap (P/N 0998-7114) and
8-32 screw (P/N 0991-2257). An 8-32 threaded insert
has been provided in the strap for this purpose.
13. Replace the rear panel, locating the heated transfer line
in the access hole provided in the rear panel.










