User`s guide
Index
401
Setting Column Head
Pressure
78
Gauze
Loading Accessory
286
Retaining Disk 285
GC Cycle Time 102, 141
GC Temp Calib 258
Glass
Fiber Filters
219
Lined Stainless Steel Tubes
186
Tubes 186
Wool Plugs 280
GLP Tracking 125, 173
Graphite Ferrules 216
Gripper
Could Not Close Fault
359
Could Not Open Fault 360
Guard Plate 57
H
Handshake Mode 124, 172
Heat Rate 98, 138, 209
Heated
Purge
214, 311
Purge Temperature 120
Heated Valve
Maximum Temperature
122, 170
Rotor 210
Temperature 98, 138, 210
High
Background
370
Cold Trap Temperature 210
Humidity, Laboratory 35
Hydrogen 71
I
Impedance Calibration 257
Improved
Accuracy
310
Productivity 306
Information
Chemical Safety
24
Safety 20
Sample Tubes 28
Initialize Failure Fault 362
Inject Signal 43
Injection
Internal Standard
104, 145,
213
Number of 105, 146, 213
Injector
Installation of Transfer Line
55
Inlet Pressures/Flow
Conversion Tables
388
Inlet Split 105, 146, 152
Enabling 105, 146, 214
Measure Flows 310
Pneumatics Tab 110
Setting Flow Rates 78
Inlet Split Flow Rate 78
Input Signal 46
Ready In 46
Start In 46
Stop In In 46
Input/Output Port 43
Inserts for Tubes (PTFE) 336
Installation
ATD and TD
33
by a Service Engineer 33
by Experienced User 33
Carrier Gas Filters 72
Checklist 33
Column Connections 61,
64
Direct Column Connection
68
Electrical Connections 42
GC Connections 41
Packed Column Connection
66
Setting Carrier Gas Flow 77
TD/ATD to Any GC 48
TD/ATD to AutoSystem










