User`s guide
Operation
175
Sample tubes with pen clips may be loaded onto the TD. The tube
must be placed into the TD with the pen clip facing back, toward the
back of the instrument.
To load the tube:
1. Remove both caps from the tube. Ensure that the
instrument is Ready.
2. Place the tube into the tube compartment with the
sampling end (grooved end) upwards.
3. Center the tube in the lower, mobile seal and push down
on the seal with the tube. Gently push the tube in and
center the tube below the upper seal until it is seated and
then release the tube.
4. Press the Seal Up button to raise the mobile seal.
5. Press Start.
6. Once the tube has been sampled, the display status will
be: Cooling. Do not touch the tube while this message is
displayed. The tube will still be hot from the desorption
process.
7. When the instrument status changes to Ready, press the
Seal Dwn button. The Mobile Seal will move down and
the tube will be released.
Single Method Operation on the TD
Once you have set up the TD and entered a method for your
application you are ready to begin analyzing your samples.
Single method operation is the simplest. Single Method Operation
must be selected. See Preferences Tab on page 117.
1. Ensure that the GC is ready.
2. Select the Run tab. Instructions will be displayed on the
WARNIN
G
Ensure that sample tubes are cool before handling them.










