User`s guide
Operation
167
Figure 50 Old and New Trap
See the Routine Maintenance, chapter 6 later in this guide for these
procedures. See the following figure for a view of the Integrity
Testing popup screen.
Figure 51 Config Tab PPC Integrity Testing Popup (only
available in the TurboMatrix 650ATD)
Monitor Tube Impedance-Selection of the check box enables
the input boxes for Lower and Upper Limits. The measured
pressure will be reported in the Log file with the sample entry
and will be compared against the entered values.
Old Trap
New Trap










