User`s guide

Operation
135
in this chapter.
1. Switch to the Run tab.
2. Select the Sequence button to enable the option. Press
the start tube entry box.
3. Press the plus or minus button to select the desired start
tube. Then enter the desired end tube.
4. From the method drop-down box, select the method to
be used for the selected range of tubes.
5. Press the Add button to add the entry to the sequence.
6. Repeat these steps until you have created the desired
sequence.
7. To delete an entry from the sequence, select the entry in
the list and press the Del button. To change the tube
range, you must add a new entry with the revised tube
range and then delete the old entry.
NOTE: If you enter a tube range that has already been entered into
the sequence a warning message will be displayed.
8. If you edit the methods called by your sequence the
sequence will use the revised methods. If you need to
edit a method but do not want to affect your sequence,
then save the revised method with a different name.
You can use up to 8 methods in your sequence. If you
need to use more than 8 methods, you must use the PC
Remote Control Software (optional).
9. Press the green Start button to run the sequence.
The TD or ATD will configure itself based on the first
method. The instrument status will be Standby until the
instrument reaches all of the set points. If you are using
a TD, you must now load the tube. Once the ATD has
reached the set points, the first tube will be loaded and
the analyses will continue as determined by the
sequence.