User`s guide

Operation
96
method. The instrument status will be Standby until the
instrument reaches all of the set points. If you are using
a TD, you must now load the tube. Once the ATD has
reached the set points, the first tube will be loaded and
the analyses will continue as determined by the
sequence.
Editing a Sequence
To delete an entry from the sequence, select the entry in the list and
press the Delete button. To change the tube range, you must add a
new entry with the revised tube range and then delete the old entry.
If you edit the methods called by your sequence, the sequence will
use the revised methods. If you need to edit a method but do not
want to affect your sequence, then save the revised method with a
different name.
Status Tab
The status tab consists of four views: Temperature, Timing,
Options and PNU. You select the desired view by selecting the
corresponding radio button on the lower half of the touch screen.
You can view the Actual values as they are on the ATD/TD or you
can view the Set Points. If you are viewing the Actual values, the
parameters that have reached their set point are displayed in black,
those that are still changing are highlighted in yellow and displayed
in red.
Normally you will use the Status display to monitor the instrument.
You can also use the Status tab to create a method. By using the
Status tab, rather than the Method Editor, you can enter
parameters, run an analysis, change the settings based on the results
and then perform another analysis. You can proceed in this manner
until you have obtained the desired method parameters. Once the
method is complete you can save it and use it on the Run tab. Refer
to Chapter 5 for details on creating a method.