Operation Manual

Operating instructions ATAG E-Series
4
The Benchmark Scheme
ATAG Heating UK Ltd is a licensed member of the
Benchmark Scheme which aims to improve the
standards of installation and commissioning of
domestic heating and hot water systems in the UK
and to encourage regular servicing to optimise
safety, efficiency and performance.
Benchmark is managed and promoted by the
Heating and Hotwater Industry Council. For more
information visit www.centralheating.co.uk
Please ensure that the installer has fully completed
the Benchmark Checklist on the inside back pages
of the installation instructions supplied with the
product and that you have signed it to say that you
have received a full and clear explanation of its
operation. The installer is legally required to
complete a commissioning checklist as a means of
complying with the appropriate Building
Regulations (England and Wales).
All installations must be notified to Local Area
Building Control either directly or through a
Competent Persons Scheme. A Building
Regulations Compliance Certificate will then be
issued to the customer who should, on receipt, write
the Notification Number on the Benchmark
Checklist.
This product should be serviced regularly to
optimise its safety, efficiency and performance. The
service engineer should complete the relevant
Service Record on the Benchmark Checklist after
each service.
The Benchmark Checklist may be required in the
event of any warranty work and as supporting
documentation relating to home improvements in
the optional documents section of the Home
Information Pack.“