Operation Manual

Operating instructions ATAG E-Series
12
Holiday period:
Adjust the thermostat to the holiday period. See
the user thermostat manual. The hot water facility
can be switched off by means of the program key
on the control panel.
Re-setting the central heating system:
Switch off the three program keys , , if
these are activated.Switch off the power supply.
When the boiler is being drained one should take
into account that a part of the heating water will
remain in the boiler. When risk of frost arises one
should take care that the remaining central heating
water in the boiler does not freeze.
Holiday
The ATAG BrainQ room
thermostat is provided with
a holiday program. The
holiday period can be
adjusted on the thermostat
itself. The central heating
and DHW supply are
switched off during that
period. There is also the
option that only the central
heating is switched off. With
all of these possibilities the
frost protection system is
active.
Turning the boiler off