Installation guide
Installation 42
Synapse Installation Guide
 To install the Gateway: (Continued)
Figure 21. Synchronized
The Gateway takes about a minute to power up.
After another Synapse device is installed, and after the Gateway has found the network
and the other Synapse device, Synchronized appears on the third line of the display, as
shown in Figure 21. This is the Idle screen.
The time and date may not be correct. You can set the time and date on the System Basic
Settings page in the WebUI or using the Deskset Admin Settings menu.
For more information, see the Synapse Administrator’s Guide at
www.telephones.att.com/synapseguides.
PSTN Gateway
T1 Gateway










