Instruction manual
DEFINITY® Business Communications System and GuestWorks® Issue 6
Overview
555-231-208
Issue 1
April 2000
Introduction
2-13Hardware
2
Figure 2-6. Standard Configurations
1) Basic System A) Processor Port Network
2) Directly Connected System B) Expansion Port Network
3) Directly Connected System
with Two EPNs
C) Center-Stage Switch
4) CSS-Connected System
with up to 15 EPNs
D) Switch Node
5) CSS-Connected System
with up to 43 EPNs