Instruction manual

Unit Loads
2-23
Installing the Control Unit
Trunk
GS-LS 0 0
DID 1.0 1.0
E&M 1.4 1.4
DS1 0 0
If the total exceeds the maximum unit loads per power supply, try to
exchange modules between carriers to reduce the load below the
maximum. No empty slots are permitted between modules.
As a general rule, if you can distribute the 800 DID modules and
telephone modules equally across the carriers, you prevent
unnecessary drain on any one carrier.
Table 2-5. Unit Loads Per PortContinued
Port Load Hybrid/PBX Mode Square-Key Mode