Instruction manual

AC Power and Grounding
2-6
Installation, SPM, Maintenance, and Troubleshooting Supplement
Installing the Backboard 2
When you are certain that the backboard meets the requirements indicated
above.
Use the following mounting hardware:
For a wood mounting surface, use wood screws.
For brick, cinderblock, or concrete, use masonry anchors.
For plaster or plasterboard, use toggle bolts.
For sheet metal, use sheet-metal screws and attach them to the structural
members.
AC Power and Grounding 2
Proper power and grounding are essential for the system to run correctly and
safely.
CAUTION:
If any of the following requirements are not met, the customer must
contact a licensed electrician. Do not install the system until all
requirements are met.
Verify that all of the following power and grounding requirements are met:
The load center of appropriate current rating must be equipped with circuit
breakers labeled 120 V AC, 15 amps.
Each breaker must protect one dedicated quad AC outlet or two dedicated
duplex AC outlets.
The mounting hardware should resist a combined pullout force of
at least 650 pounds (295 kilograms).