Instruction manual

System Testing and Verification
9.
h.
Repeat this test for the same line by placing a call from that line on station A to
station B. The transfer source is an outbound call.
If the test fails, write “n” in the “Outbound Source” column of the planning form.
Repeat steps 13a through 13g for all other BRI lines on station A.
14. When all lines assigned to station A are tested and more BRI lines are untested,
repeat step 7 above and remove the BRI lines from station A and assign the
untested lines. When all lines are tested, remove the lines from stations B and C
and assign any of the tested lines to those stations then assign the untested lines
from stations B and C to station A. Repeat the above tests for the remaining pairs.
Basic Rate Interface (BRI) Provisioning Guide
23