System information

Assign a Data Link
Issue 1 October 1997
3-23
Press and .
Save New Translations
Perform a Run Tape to save the new translations.
If the system has a duplicated common control, the Run Tape operation will
update both tapes.
Test DCIU Links
The following procedure is used to test DCIU links from the switch side. This
should be performed by local switch maintenance personnel. The appropriate
Generic 2 or System 85 maintenance manual describes the equipment and
procedures required.
Two types of tests are possible on a per link basis:
An internal, automatic loop-around test of the DCIU circuit packs.
An external, manual loop-around test providing a more thorough test of the
circuit packs.
Internal Loop Test
After entering Procedure 650, press twice [Field 1 (Test) equals 3].
1. Enter the link number in Field 6 (Data Link).
2. Press .
3. Wait for Error Code 80.
4. Press again [Field 8 (Alarm Status) equals 1].
5. Press (wait lamp is inactive for this test).
6. Press after 8000 bits are sent.
1. From Worksheet D: Assign the Data Link. This is the same as Word 1, Field 7.
2. From Worksheet C: Assign the I
NTUITY AUDIX Split
Field Manager II Field Name Enter
1 Network Adjunct Class 2
2 Network Adjunct Number [network adjunct #]
1
3 Adjunct Extension [INTUITY AUDIX system extension or VDN]
2
ADD EXECUTE
NEXT^TEST
BUSY^OUT
BUSY^OUT
EXECUTE
STOP