System information
DCS Worksheets
Issue 1 October 1997
2-9
DCS Worksheets
Complete the following worksheets (Table 2-6, Table 2-7, and Table 2-8) if the
Lucent I
NTUITY system operates in a DCS environment. If you have an existing
DCS network or if you are installing one, the GBCS Design Center may have
designed the DCS network with a Lucent I
NTUITY system. The worksheets in this
section contain the same information the Design Center may have already
created. Use these worksheets to verify that you have all required information
and as a single point of reference.
This section contains worksheets for BX.25 signaling. For each remote switch in
the DCS network, complete one set of DCS worksheets. Before you complete the
worksheets, remove the worksheets from this book and make copies for each
switch in the network.