System information

Acceptance Test Administration
6-2 Issue 1 October 1997
finish tests given in the installation document. You must perform the following two
tasks to administer a System 85 or DEFINITY® G2 switch for acceptance tests.
Administer the coverage path
Administer the test subscriber stations
Use ordinary System 85 or DEFINITY® G2 methods to administer two test
subscribers for acceptance tests. After administering the test subscribers,
continue with the procedures in this chapter to administer the switch for
acceptance tests.
Use the following procedures to enable the test stations. The procedure
describes how to administer the stations on the switch and provide them with
Lucent I
NTUITY system service. Complete this task when you are ready to place
them into service.
You may do the procedures described in this chapter using any of the following
switch administration tools.
Maintenance and Administration Panel (MAAP)
Manager II, III, or IV
Subscriber administration on the switch includes:
Defining a coverage path with the Lucent INTUITY system hunt group as a
coverage point.
Changing the feature options to enable Leave Word Calling (LWC)
reception to the Lucent I
NTUITY system.
Assign Switch Features for INTUITY
AUDIX System Subscribers
To complete administration of the switch for acceptance testing, you must assign
to the test subscribers the appropriate switch features and the coverage path to
the I
NTUITY AUDIX system. Table 6-1 summarizes procedures on this acceptance
test administration.
Table 6-1. LUCENT INTUITY Switch Features Procedure Overview
Step Procedure Field Manager II Field Name Enter Press
1 010 Word 1 1 Class of Service COS # Add
4 Busy and Don’t Answer 1
5 Follow Me 1
14 Conference 3-Party/Transfer 1
Continued on next page