Instruction manual
HARDWARE AND SOFTWARE DETERMINATION
Traffic Considerations
To determine if traffic engineering calculations should be made for G1 or G3i, consider the follow-
ing (for G3r, traffic engineering will be done regardless):
YES NO
Will the number of busy-hour calls meet or exceed 7200
(G1) or 10,000 (G3i)?
1 -
Will the call activity be different than the balance of 36%
outgoing, 36% incoming, 28% intra-premises (± 10%)?
2 -
Will the trunk (all types) to terminal ratio exceed 50%?3 -
Is ARS requested with more than 425 terminals?4 -
Is DID with Message Center Service requested and are
there more than 425 terminals?
5 -
Will more than 50% of the incoming traffic be handled by
the Attendant?
6 -
Will AUDIX be used?7 -
Will DCS or ISDN-PRI be used?8 -
In most domestic locations, the DOSS/ATTOMS-CPS configurator must be used
for all DEFINITY G1 and G3 designs. Note carefully any configurator report
messages associated with the above items that are answered ‘‘yes.’’
72