Instruction manual
ENVIRONMENTAL REQUIREMENTS
PRINTER (OPTIONAL)MANAGER ITERMINALPROCESSOR PORTNETWORKCABINET(S)(FRONT)CABLE SLACKMANAGER(NOTE 6)CROSS-CONNECTFIELDCHAIRNOTES 3 AND 4TRUNK/AUXILIARYFIELD (NOTE 5)WALL
NOTES:POWER OUTLETS SHOULD BE LOCATED OUTSIDE THE CROSS-CONNECT FIELD AREA.POWER OUTLET(S) MUST NOT BE UNDER SWITCH CONTROL AND MUST NOT BE SHAREDWITH OTHER EQUIPMENT.PROCESSOR PORT NETWORK CABINETS REQUIRE A SPECIAL 120-VOLT, 60-HZ, 15-AMPOR 20-AMP POWER OUTLET (NEMA 5-15 OR NEMA 5-20 RECEPTACLE, OR EQUIVALENT).SYSTEM MUST BE GROUNDED BY ONE OF THE APPROVED METHODS LISTED IN THIS SECTION.EARTHQUAKE PROTECTION MAY BE REQUIRED.THE TRUNK/AUXILIARY FIELD MAY BE LOCATED WITHIN THE CROSS-CONNECT FIELD.EACH SCC USES 10-FOOT B25A CABLES FROM THE A AND B CABINET POSITIONS AND 15-FOOTB25A CABLES FROM THE C AND D CABINET POSITIONS. FIBER CONNECTIONS BETWEEN PORTNETWORKS USE 20-FOOT (FL2P-P-20) FIBER CABLE.
NOTES 1 AND 2
1.
2.3.4.5.6.
32” 27”22”TABLE40”
FIGURE 10. Typical Single-Carrier Cabinet Floor Plan
With Processor Port Network Only
105