Instruction manual

HARDWARE AND SOFTWARE DETERMINATION
Ordering Information
Enter the quantities of equipment to be ordered on the Order Summary Sheet which follows
(make additional copies of the sheet if needed). The sheets, when completed, can be attached to
the order. Use the information listed on the various tables in the manual to complete the entries.
To ensure all equipment and facilities are ordered, complete the following checklist.
Are the following pieces of equipment/facilities required and have they been ordered or
addressed?
Required Ordered
Yes No Yes No
DEFINITY cabinet(s) (1 required)
Circuit packs (required)
System adjuncts (See Note 1)
Attendant Console(s)
Manager I Terminal(s) (G1)
G3-Management Terminal(s) (G3)
Terminals (voice & data) (See Note 2)
Terminal adjuncts (See Note 3)
Trunk facilities (local & special)
Network Interface
Switch/Terminal wiring, cable access panel, power failure
transfer arrangements (Contact Premises Service Consul-
tants)
Notes:
1. System Adjuncts: Printers, Local Storage Units, Queue Warning Lamps, Adjunct Proces-
sors, Call Detail Recorders, TELESEER CDR
2. Terminals: Voice Terminals (2500, 7100, 7300, 7400D Series, and CallMaster-602A1)
Data Terminals, Data Sets, Data Modules (PDM/MPDM, TDM/MTDM, 7400A, 7400B,
7500B, BCTs, Z3A-ADU)
3. Terminal Adjuncts: Cords, Speakerphones, Modules (DDM, FKM, CCM, DTDM), DC
power for modules, Amplifier handsets, Headsets/Adapters)
100