Instruction manual

CHAPTER 3. SYSTEM ADMINISTRATION
CHAPTER 3. SYSTEM ADMINISTRATION
Administration Sequence
After the system is installed, the System Manager must enter the translation data into the system
memory using the system administration terminal.
Before initializing the system, verify that the screen displays
Login:
If your terminal does not
display
Login:,
call your AT&T Account Team.
The Implementation manual for your DEFINlTY system provides the details for gathering the
translation data. It also provides detailed descriptions and procedures required to complete all
the screen forms used to enter translation data into the system. The document also provides the
administration commands that can be used to administer system and voice terminal features, and
error messages.
Obtain all duplicated forms from the Implementation manual and sort them into groups. For
example, forms for all voice terminals, and hunt and trunk groups should be separated. A copy
of the Port Assignment Record should be available to keep track of the items being installed in
the system.
When entering the translation data into the system, the System Manager should periodically save
the translations on tape. This creates a nonvolatile copy of the translation already entered into
the system. If a power outage or system failure occurs, the translation data saved on the tape
will not have to be entered again.
The system features should be entered into the switch in an ordered manner. The following is
the recommended order in which data should be entered into the system:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Login and Password (Change Password, if necessary)
Dial Plan
Feature Access Codes
System Features (Class of Service and Class of Restriction)
Console Parameters
Attendant Consoles
System Parameters
Voice Terminals
Modules
Netcon Channels
Groups (hunt groups, pickup groups, etc.)
Trunk Groups
Automatic Route Selection
Administered Connections
3-1