Instruction manual

ENVIRONMENTAL REQUIREMENTS
WALL
NOTES 1 AND 2
.
TRUNK/AUXILIARY
FIELD (NOTE 7)
38"
TABLE
NOTES 1 AND 3
CROSS-CONNECT FIELD (EXTEND AS REQUIRED)
CABLE SUCK
MANAGER
(NOTE 8)
28"
PRINTER
(OTIONAL)
MANAGER I
TERMINAL
PROCESSOR
PORT
NETWORK
CABINET
(FRONT)
CABLE SLACK
CABLE SLACK
MANAGER
MANAGER
(OPTIONAL) (OPTIONAL)
EXPANSION
AUXILIARY
PORT
CABINET
NETWORK
(OPTIONAL)
CABINET
(OPTIONAL)
28"
32" 32"
32"
CHAIR
NOTES 4,
5, AND 6
NOTES:
1.
POWER OUTLETS MUST NOT BE UNDER SWITCH CONTROL,
2.
3.
4.
5.
6.
7.
8.
MUST NOT BE SHARED WITH OTHER
EQUIPMENT, AND SHOULD BE LOCATED OUTSIDE THE CROSS-CONNECT FIELD AREA.
PROCESSOR PORT NETWORK AND EXPANSION PORT NETWORK CABINETS REQUIRE SPECIAL
120-VOLT, 60-HZ, 50-AMP POWER OUTLETS (NEMA 5-50R RECEPTACLE, OR EQUIVALENT).
AUXILIARY AND AP CABINETS REQUIRE A SPECIAL 120-VOLT, 60-HZ, 20-AMP POWER OUTLET
(NEMA 5-20R RECEPTACLE, OR EQUIVALENT).
ALLOW AT LEAST 36 INCHES (91.4CM) OF SPACE IN FRONT OF CABINET TO PERMIT DOOR TO
SWING OPEN.
SYSTEM MUST BE GROUNDED BY ONE OF THE APPROVED METHODS.
EARTHQUAKE PROTECTION MAY BE REQUIRED.
THE TRUNK/AUXILIARY FIELD MAYBE LOCATED WITHIN THE CROSS-CONNECT FIELD.
EACH MCC CABINET USES 10-FOOT B25A CABLES FROM THE D AND E CABINET POSITIONS AND
15-FOOT B25A CABLES FROM THE A, B, AND C CABINET POSITIONS. FIBER CONNECTIONS
BETWEEN PORT NETWORKS USE 20-FOOT (FL2P-P-20) FIBER CABLE.
FIGURE 22. Typical Floor Plan With Processor and Expansion Port Networks
151