Instruction manual

ENVIRONMENTAL REQUIREMENTS
WALL
TRUNK/AUXILIARY
FIELD (NOTE 5)
40"
TABLE
PRINTER
(OPTIONAL)
MANAGER I
TERMINAL
27" 32"
NOTES 3 AND 4
PROCESSOR
PORT
NETWORK
CABINET(S)
(FRONT)
CROSS-
CONNECT
FIELD
CABLE SLACK
MANAGER
(NOTE 6)
NOTES 1 AND 2
CHAIR
NOTES:
1. POWER OUTLETS SHOULD BE LOCATED OUTSIDE THE CROSS-CONNECT FIELD AREA.
POWER OUTLET(S) MUST NOT BE UNDER SWITCH CONTROL AND MUST NOT BE SHARED
WITH OTHER EQUIPMENT
2. PROCESSOR PORT NETWORK CABINETS REQUIRE A SPECIAL 120-VOLT, 60-HZ, 15-AMP
OR 20-AMP POWER OUTLET (NEMA 5-15 OR NEMA 5-20 RECEPTACLE, OR EQUIVALENT).
3. SYSTEM MUST BE GROUNDED BY ONE OF THE APPROVED METHODS LISTED IN THIS SECTION.
4. EARTHQUAKE PROTECTION MAYBE REQUIRED.
5. THE TRUNK/AUXILIARY FIELD MAYBE LOCATED WITHIN THE CROSS-CONNECT FIELD.
6. EACH SCC USES 10-FOOT B25A CABLES FROM THEA AND B CABINET POSITIONS AND 15-FOOT
B25A CABLES FROM THE C AND D CABINET POSITIONS. FIBER CONNECTIONS BETWEEN PORT
NETWORKS USE 20-FOOT (FL2P-P-20) FIBER CABLE.
FIGURE 20. Typical Single-Carrier Cabinet Floor Plan
With Processor Port Network Only
149