Instruction manual

HARDWARE AND SOFTWARE DETERMINATION
Traffic Considerations
To determine if traffic engineering calculations should be made for G1, G3i, or G3i-Global, con-
sider the following (for G3r, traffic engineering will be done regardless):
1-
2-
3-
4-
5-
6-
7-
8-
Will the number of busy-hour calls meet or exceed 7200
(G1) or 10,000 (G3i, G3i-Global)?
WiII the call activity be different than the balance of 36%
outgoing, 36% incoming, 28% intra-premises (±10%)?
Will the trunk (all types) to terminal ratio exceed 50%?
Is ARS requested with more than 425 terminals?
Is DID with Message Center Service requested and are
there more than 425 terminals?
Will more than 50% of the incoming traffic be handled by
the Attendant?
WiII AUDIX be used?
Will DCS or ISDN-PRI be used?
YES
NO
In most United States locations, the DOSS®/ATTOMS-CPS configurator must be
used for all DEFINITY G1 and G3 designs. Note carefully any configurator report
messages associated with the above items that are answered “yes.”
If the customer system is to have ISDN-PRI or ISDN-BRI, or is to serve a large,
telemarketing application, contact your product support organization for assis-
tance.
100