User guide
CMS Base Load Upgrade Procedure for High Availability Systems
CentreVu
CMS R3V8 High Availability User Guide
G-2
IConceptual depiction of the base load upgrade process for a CMS HA system.
Primary CM S server Secondary CMS server
Interval A begins (5:00)
(5:29)
Interval B begins (5:30)
(5:59)
Interval C begins
Interval D begins
Synchronize
using 5:00 - 5:29
Synchronize
using 5:30 - 5:59
Note from the graphic
at w hat point in tim e
events occur.
Base Load Upgrades
= Link up
= Link down
Link down (perform upgrade)
Link up
Link down (perform
upgrade)
Link up
(5:13)
(5:19)
Link back up
Link back up
(
5:
35)
(
5:
42)