User guide
Contents
Issue 1 September 1995 v
■ Task 14: Perform Initial DEFINITY
AUDIX Administration 3-11
Task 14A: Set the DEFINITY AUDIX Clock 3-12
Task 14B: Assign the DEFINITY AUDIX
Machine Parameters 3-13
Task 14C: Run the Switch Translations Audit 3-14
Task 14D: Administer Voice Ports 3-15
Task 14E: Set Switch-Link Parameters 3-16
Set Switch-Link Parameters for CL Integration 3-16
Set Switch-Link Parameters for DS Integration 3-18
Task 14F: Synchronize DEFINITY AUDIX System
and Switch Clocks 3-20
Task 14G: Set System Parameters Limits 3-21
Task 14H: Run the Switch Translations Audit
a Second Time 3-22
Task 14I: Assign the Time Zone 3-22
Task 14J: Reboot the DEFINITY AUDIX System 3-24
Subtask 14K: Run the Switch Names Audit 3-25
Task 14L: Check Alarm Status 3-26
Task 14M: Check Hardware Status 3-26
■ Task 15: Activate Parameters and Basic Features 3-29
■ Task 16: Add Tape 3-31
■ Task 17: Check the Status of the
Switch Names Audit 3-34
4 Acceptance Checks 4-1
■ Acceptance Check Tasks 4-1
■ Worksheets Needed 4-2
■ Task 18: Alarm Origination
Administration/test and Status Tape 4-2
■ Task 19: Perform Dial Tone Test for DS
Integrated Systems 4-6
■ Task 20: Run Test Switch-Link Long 4-7
■ Task 21: Add Two Test Subscribers 4-8