User guide
Contents
iv Issue 1 September 1995
LAN Connection 2-10
Reserved RS-232 Connection 2-12
MFB Port Usage for DS and CL Integration 2-12
■ Task 7: Install the Terminals 2-12
Task 7A: Install a Terminal via a Direct Connection 2-13
Task 7B: Install a Terminal via Modems 2-16
Task 7C: Install a Terminal via ADUs 2-18
Task 7D: Install a Terminal via 7400A Data Sets 2-20
■ Task 8: Install the Control-Link Cable 2-22
Connect to the PI without an IDI 2-23
Connect to the PI with an IDI 2-24
Connect to the Digital Line Interface (TN754) 2-25
Connect to the Packet Gateway Board (G3r only) 2-26
Connect to the TN577 via DSUs (G3r Only) 2-27
Connect to the TN577 via MPDMs (G3r Only) 2-28
■ Task 9: Install the Printer (Optional) 2-29
■ Task 10: Finalize and Test the Hardware 2-30
3 Initial System Administration 3-1
■ Initial System Administration Tasks 3-1
■ Worksheets Needed 3-2
Control Link (CL) Only 3-2
Display Set (DS) Only 3-2
■ Windowing on the 715 Terminal 3-3
■ Task 11: Perform Initial Switch Administration 3-3
■ Task 12: Activate Customer Options 3-4
Display Customer Options 3-4
Change Customer Options 3-6
■ Task 13: Activate DEFINITY AUDIX
Server Hardware Options 3-7
Task 13A: Set System Parameters for Intuity
Message Manager 3-8
Task 13B: Check Access for Intuity Message
Manager 3-9