User guide
Acceptance Checks
4-16 Issue 1 September 1995
2. Press the (F3) function key to begin the test. The test takes up to
2½ minutes to run.
3. If any of the individual tests fail or abort, refer to
DEFINITY AUDIX
System — Maintenance
, 585-300-110. If there are problems with the
network itself, the LAN system administrator will have to resolve these
problems before proceeding with this test.
4. To test if a connection can be made to a Intuity Message Manager user or
other LAN node, at the DEFINITY AUDIX administration command line
type test lan dest
followed by the IP numerical address (in the form
nnn.nnn.nnn.nnn
) on the screen then press . Press the (F3)
function key. If the connection is made, a UNIX ping will be returned. The
test takes approximately 15 seconds. If the test fails, refer to
DEFINITY
AUDIX System — Maintenance
, 585-300-110.
5. After the tests pass, proceed to Task 25.
Task 25: Clear Administration, Error,
and Alarm Logs
This task must be completed from the Remote Support Center (RMC). Call the
RMC and let them know you have completed all the installation and acceptance
tests for this DEFINITY AUDIX system. Ask them to clear the administration, error,
and alarm logs.
This is the end of your (the installation technician) installation responsibilities for
this DEFINITY AUDIX system. The tasks in Chapter 5, ‘‘Initial Subscriber
Administration’’ and Chapter 6, ‘‘Customer Acceptance’’ are to be completed by
the customer system administrator, the implementor and the AT&T project
manager.