User guide

Acceptance Checks
4-8 Issue 1 September 1995
The system responds with the Switch-Link Test Results screen.
4. Press the (F3) function key to begin the test.
The test takes from 2 to 5 minutes to complete.
5. When the test completes successfully, proceed to Task 24: Test Local Area
Network on page 4-15. If the test does not complete, refer to
DEFINITY
AUDIX System Maintenance
, 585-300-110.
6. If running in a DCS network, the test results for each switch node will
appear on the Switch-Link Test Results screen. Verify that each node test
is completed successfully.
7. Type release voice-group and press .
8. Press (F3) to execute the command.
9. Proceed to Task 21: Add Two Test Subscribers.
Task 21: Add Two Test Subscribers
This task is required for all installation scenarios.
1. If you have not already done so, log into the DEFINITY AUDIX local
terminal as craft. (See Task 14A: Set the DEFINITY AUDIX Clock for the
login procedure.)
2. Type add subscriber and press .
ENTER
RETURN
ENTER
RETURN