User Manual
Table Of Contents
- Safety information
- Chapter 1: Product Introduction
- Chapter 2: Basic Installation
- Chapter 3: BIOS Setup
- 3.1 Managing and updating your BIOS
- 3.2 BIOS setup program
- 3.3 Main menu
- 3.4 Ai Tweaker menu
- 3.5 Performance Tuning menu
- 3.6 Advanced menu
- 3.5.1 Trusted Computing
- 3.5.2 ACPI Settings
- 3.5.3 SMART Self Test
- 3.5.4 Super IO Configuration
- 3.5.5 Serial Port Console Redirection
- 3.5.6 Onboard LAN Configuration
- 3.5.7 APM
- 3.5.8 PCI Subsystem Settings
- 3.5.9 Network Stack Configuration
- 3.5.10 CSM Configuration
- 3.5.11 NVMe Configuration
- 3.5.12 USB Configuration
- 3.5.13 iSCSI Configuration
- 3.5.14 Intel(R) Virtual RAID on CPU
- 3.6 Platform Configuration menu
- 3.7 Socket Configuration menu
- 3.8 Event Logs menu
- 3.9 Server Mgmt menu
- 3.10 Monitor menu
- 3.11 Security menu
- 3.12 Boot menu
- 3.13 Tool menu
- 3.14 Save & Exit menu
- Chapter 4: RAID Support
- Chapter 5: Multi GPU Support
- Appendix
5-8
Chapter 5: Multiple GPU Support
Chapter 5
4. AlignandrmlyinserttheSLI
®
bridgeconnectortothegoldngersoneachgraphics
card.Ensurethattheconnectorisrmlyinplace.
5. Connect two independent auxiliary power sources from the power supply to the two
graphics cards separately.
6. ConnectaVGAoraDVIcabletothegraphicscard.
5.2.3 Installing three SLI-ready graphics cards
Refer to the documentation that came with your graphics card package to install the device
drivers.
ToinstallthreeSLI-readygraphicscards:
1. Prepare three SLI-ready graphics cards.
2. Insert the three graphics cards into the
PCIEX16 slots. If your motherboard
has more than two PCIEX16 slots,
refer to Chapter 1 in this user manual
for locations of the PCIEX16 slots
recommended for multi-graphics card
installation.
3. Ensure that the cards are properly
seated on the slots.
Goldfingers
SLI
®
bridge