User Manual

54
PE Series
To install a 5G LTE mPCIe module:
1. Remove the screw from the M.2 stando.
2. Align and insert the LTE module into the slot.
3. Press down, and then secure it in place using the screw previously
removed.
4. (optional) Connect the RF cables from the antennas to your LTE
module. Make that the correct cable is attached to each of the
connectors by following chart on the next page.
5. (optional) Use the cable clip to organize the cables.
NOTE:
To enable the hot-plug function of your LTE module, click the
weston-terminal icon in the upper left corner of your screen, and
type the rst command below when prompted:
mm_cli sim-detect 1 (enable hot-plug function)
mm_cli sim-detect 0 (disable hot-plug function)
mm_cli sim-detect (display current setting)
Refer to Installing antennas for more information on installing the
antennas.
Connecting antennas to your LTE module may strengthen the
signal.
A soft clicking sound indicates that the antenna has been securely
attached on the LTE module.