User's Manual

Intel
®
820 Chipset Design Guide 2-53
Layout/Routing Guidelines
DP Systems: For dual processor systems, BREQ0# (to one of the processors) needs to be driven
for arbitration ID strapping. Refer to Figure 2-43 for an example of the BREQ connections in a DP
system. It is a requirement that the on-board logic tri-state BREQ0# after the arbitration ID
strapping is complete. Additionally, BREQ0# and BREQ1# are high-speed AGTL+ signals and the
loading characteristics of the on-board logic must be considered even when the logic is tri-stated.
This circuit holds BREQ0 low for two clocks after the deassertion of reset. The 2N3904 connected
to BREQ0 should be connected to the BREQ0 AGTL trace with a very short stub. Additionally, the
series current limiting resistor on CPURESET should be attached to the CPURESET trace with a
very short stub.
External Circuit Recommendation for HA7 Strapping for IOQ Depth of 1
For debug purpose, the external logic to set the IOQ depth of 1 on the front side bus may be
needed. Do not add this circuit for production since overall system performance will be degraded.
The external logic for HA7# strapping is very similar to the BREQ0 strapping that is described in
the previous section.
The timing requirement of HA7# strapping is also similar to BREQ0 strapping for the hold time
after the deassertion of RESET# (RSTIN# signal from MCH). The value of the strapping needs to
be held for a minimum of 2 host clocks after the deassertion of RSTIN#. Refer to the latest version
of the processor datasheets for complete description on the timing requirement.
Figure 2-43. Dual-Processor BREQ Strapping Requirements
Figure 2-44. BREQ0# Circuitry for DP Systems
CPU #1 CPU #2
BREQ0# BREQ0# BREQ1#BREQ1#
on-board logic
CPURST#
CPUCLK
R2
2.7 K
5V
5V5V
2
5
6
4
1
3
1
2
3
4
5
6
QQ
/Q /Q
D
/PRE
/CLR
/PRE
/CLR
D
CLK CLK
74F74 74F74
2N3904
2N3904
BREQ0#
R2
4.7 K
4.7 K