User Guide
Table Of Contents
- Notices
- Chapter 1: Product Introduction
- Chapter 2: Hardware Information
- Chapter 3: Installation options
- Chapter 4: Motherboard Info
- Chapter 5: BIOS setup
- 5.1 Managing and updating your BIOS
- 5.2 BIOS setup program
- 5.3 Main menu
- 5.4 Advanced menu
- 5.4.1 ACPI Settings
- 5.4.2 Smart Settings
- 5.4.3 NCT6779D Super IO Configuration
- 5.4.4 Onboard LAN I210 Configuration
- 5.4.5 Serial Port Console Redirection
- 5.4.6 APM
- 5.4.7 Advanced Power Management Configuration
- 5.4.8 PCI Subsystem Settings
- 5.4.9 Network Stack Configuration
- 5.4.10 CSM Configuration
- 5.4.11 Trusted Computing
- 5.4.12 USB Configuration
- 5.4.13 iSCSI Configuration
- 5.5 IntelRCSetup menu
- 5.5.1 Processor Configuration
- 5.5.2 Advanced Power Management Configuration
- 5.5.3 Common RefCode Configuration
- 5.5.4 QPI Configuration
- 5.5.5 Memory Configuration
- 5.5.6 IIO Configuration
- 5.5.7 PCH Configuration
- 5.5.8 Miscellaneous Configuration
- 5.5.9 Server ME Configuration
- 5.5.10 Runtime Error Logging Support
- 5.6 Server Mgmt menu
- 5.7 Event Logs menu
- 5.8 Monitor menu
- 5.9 Security menu
- 5.10 Boot menu
- 5.11 Tool menu
- 5.12 Exit menu
- Chapter 6: RAID Configuration
- Chapter 7: Driver installation
- 7.1 RAID driver installation
- 7.2 Management applications and utilities installation
- 7.3 Running the Support DVD
- 7.4 Intel® chipset device software installation
- 7.5 Installing the Intel® I210 Gigabit Adapters driver
- 7.6 VGA driver installation
- 7.7 Intel® Rapid Storage Technology enterprise 4.1 installation
- Appendix
3-3
ASUS ESC8000 G3
3. Secure the rail components to the rail using the bundled screws.
4 Press the spring lock (A) then insert the studs into the selected square mounting holes
on the rack post.
5. Press the spring lock on the other end of rail then insert the stud into the mounting hole
on the rack post. Extend the rack rail, if necessary.
6. (Optional) Use the rail screw and rail washer (B) that comes with the kit to secure the
rack rail to the rack post.
7. Perform steps 3 to 5 for the other rack rail.
Ensure that the installed rack rails (left and right) are aligned, secured, and stable in place.
8. Lift the server chassis and insert into the rack rail.