User Manual

Table Of Contents
2-7
ASUS ESC4000-E10
6. Do two (2) clockwise turns on each of the heatsink screws in the cross order pattern
shown on the illustration until the heatsink screws are tightened and the heatsink is
secured onto the motherboard.
Intel
®
recommends a using a torque driver with a T-30 bit and a torque value of 8 lbf-in to
prolong the longetivity of all PEEK nuts after the quality of the load post is corrected.
5. Align the heatsink and CPU assembly to the CPU socket, then place the heatsink on
top of the CPU socket (A). Push the lock latches INwards on all four corners of the
heatsink so that the heatsink and CPU assembly is secured to the CPU socket (B).
Ensure the triangle mark on the CPU is located in the same corner as the CPU socket.
7. Reinstall the air duct. For more information, see the section
Air Duct
.