Specifications
32
./4%$)!'2!-3),,5342!4)/.3!2%./44/3#!,%
)../6!4)6%(%!24(02/$5#43s$)2%#46%.4'!3&)2%0,!#%3-ONTEBELLO$,8-ONTEBELLO$,8#$s).34!,,!4)/.).3425#4)/.3
Pilot Hood
Igniter Rod
Flame
Sensor
Pilot
Nozzles
Pilot
Orifice
Pilot
Hood
Wire
(from DFC Wire
Harness)
Pressure Regulator
Tower
Main Gas Inlet
3/8" NPT
Green Wire
(from DFC Wire Harness)
Inlet (IN) Test Port
Manifold (OUT) Test Port
Connect GTMS
wire harness.
Yellow Ground Wire
(from DFC Wire Harness)
Step 16.2ELIGHTTHEMAIN BURNER AND VERIFY
PROPERBURNERIGNITIONANDOPERATION3EEBurner
Adjustments Pages 26 and 27.
Inspect the pilot system for proper flame. The
pilot flame should engulf the flame sensor as
shown in Figure 59.
4HELIGHTINGINSTRUCTIONSCANBEFOUNDONTHE
LIGHTINGLABELINTHECONTROLCOMPARTMENTORIN
THE#AREAND/PERATION-ANUALPROVIDEDWITH
the appliance.
Step 17. Using a manometer, test the inlet and
manifold gas pressures. See Tables 2 and 3
on Page 4.
ALWAYS TEST PRESSURES WITH THE VALVE
REGULATOR CONTROL AT THE HIGHEST
SETTING.
SEE PAGE 26 FOR AIR SHUTTER ADJUSTMENT
GUIDELINES.
A.2EMOVETHEORIlCEFROMTHEMANIFOLDAND
REPLACEITWITHTHEONEPROVIDEDINTHEKIT3EE
THEFOLLOWINGTABLEFORORIlCESIZESFORNATURAL
and propane models. Figure 58 illustrates
THEORIlCE5SEPIPEJOINTCOMPOUNDOR4EF-
LONTAPEONALLPIPElTTINGSBEFOREINSTALLING
ENSUREPROPANERESISTANTCOMPOUNDSARE
used in propane applications, do not use pipe
JOINTCOMPOUNDSONmARElTTINGS
B.2ETRIEVETHEBURNERANDSLIDETHEVENTURITUBE
OVERTHEORIlCE3ETTHEBURNERASSEMBLYINTO
its position and secure it.
C.2EINSTALLTHEGRATEASSEMBLY
Step 13.2EASSEMBLETHEREMAININGCOMPO-
NENTSBYREVERSINGTHEPROCEDURESOUTLINEDIN
the preceding steps.
Step 14.!TTACHTHECONVERSIONLABELPROVIDED
INTHECONVERSIONKITTOTHERATINGPLATEONTHE
appliance.
Step 15. Apply gas to the system and relight
APPLIANCE7ITHTHEMAINBURNER/.TESTTHE
NEWPRESSUREREGULATORASSEMBLYANDALLGAS
LINEJOINTSFORLEAKSUSINGAGASLEAKTESTSOLU-
tion. See Test All Connections For Gas Leaks
on Page 23.
Figure 58
Step 6. Refer to the instructions provided
WITHTHE3)4REGULATORCONVERSIONKIT5SINGA
4ORX4WITHSHANKANDCENTERHOLEOR
slotted screwdriver, remove and discard the
two pressure regulator mounting screws, the
pressure regulator tower, and the diaphragm
ASSEMBLYIFAPPLICABLEProperly dispose of
all removed components-AKESURETHERUBBER
GASKETINSTALLEDONTHEBACKOFTHEREPLACEMENT
pressure regulator is properly positioned.
Step 7. Install the new stepper motor pressure
REGULATORASSEMBLYUSINGTHESUPPLIEDSCREWS
3ECURELYTIGHTENTHESCREWSINLBS
Step 8. !TTACHTHEENCLOSEDIDENTIlCATIONLABEL
TOTHEVALVEBODYWHEREITCANBEEASILYSEEN
Step 9. -AKE STEPPER MOTOR AND VALVE
electrical connections.
Step 10. 2EMOVETHEPILOTHOODASSEMBLYTO
ACCESSTHEHEXEDPILOTORIlCE5SINGAAL-
LENWRENCHREMOVEANDREPLACETHEPILOTORIlCE
WITHTHEONEPROVIDEDWITHTHEKIT
NOTE: Use extreme care to avoid
damaging the igniter assembly.
Step 11. Refer to Figure 57 and remove the
PILOTHOODASSEMBLYTOACCESSTHEHEXEDPILOT
ORIlCE2EMOVEANDREPLACETHEORIlCEWITHTHE
ONEPROVIDEDWITHTHEKIT
Step 122EFERTOFigure 55 on Page 31 and
Figure 58)
VERIFY THE PROPER ORIFICE SIZE BE-
FORE INSTALLING IT.
Figure 56
Burner Orifice Sizes
Elevation 0-4500 feet ( 0-1372 meters)
Model
Natural Gas
drill size (inches)
Propane
drill size (inches)
40 in.
0.1405" (#28)*
s(
0.086" (#44)*
s(
45 in.
0.161" (#20)*
s(
0.093" (#42)*
s(
Table 11
* Standard size installed at factory
s0ART#AT.UMBER
Figure 59
Figure 57