Technical data
ASTi ACE Studio Cold Start Procedure (Ver. 2, Rev. J)
Copyright © 2011 Advanced Simulation Technology inc. 3
2.1. Hardware
The Studio Development Workstation is available on a small footprint computer system or the
2U platform with removable hard drive.
The small footprint computer system is configured with a single ethernet port and DVD drive.
This system requires that the monitor connect with the DVI cable not the 15-pin VGA cable.
Ensure that the monitor is in DVI mode by pressing the left button, Input Source, on the monitor.
Important: Do not use the third USB port from the left.
Note: The small footprint computer system does not support the memtest.
Power Button
Video
Port
USB
Port
Ethernet
Port
Power Port
6.5”
2”
Figure 1: Footprint Computer System Connections
The 19” 2U rackmount platform is configured with a single ethernet port, removable hard drive
and DVD Drive.
PROPERTY OF
ASTI
0000
Network Port
Power Supply
PS/2 Keyboard
Video
Figure 2: 2U Platform Connections










