Technical data

ASTi Telestra 4 Training Manual (Ver. 1, Rev. F)
Copyright © 2010 Advanced Simulation Technology inc. 27
5.1.2. Project Manager Tool
Projects are developed and managed using the Project Manager tool. This tool is part of ASTi’s
ACE Studio software suite. When launched, the Project Manager searches the network for avail-
able Targets. Each Target found is queried and a list is generated of existing Projects stored on
each Target. The user can then pick to work with any Project from the available list. Alternatively,
the user can elect to build a new Project and select to develop on any available Target. All Project
development and modifications occur on the selected Target and can be installed from that plat-
form.
Within Project Manager the user can perform typical
file operations on a Project such as Save, Save As,
Open, Close, and New. The user must save in the
Project Manager when making any model changes
to “push” the changes back to the Target. Remember
that operations performed in a Project are done on
the selected Target.
Project development and changes are also tracked
through a built-in control management system. This
allows the user to manage Projects in a similar fash-
ion as they would software source code. Features
such as change tracking, change descriptions,
release management and the ability to return work
with earlier release instances provide powerful con-
figuration management capabilities.