Instruction Manual
INSTALLATION INSTRUCTIONS
CAUTION: Before installing, make certain the AC power is off for both normal and emergency circuits.
1a. MOUNTING THE
ALCR-D20L & ALCR-D10L ( Illustration 1)
Integral (No Flex) – Remove the driver channel cover. Mount in the ballast/driver channel
at least ½″ away from the AC driver(s).
1b. MOUNTING THE ALCR-D20L-C & ALCR-D10L-C ( Illustration 2)
Bottom
Mounting and Single Flex - Remove Junction Box lid and drill holes for mounting studs and lead wire feed
Re-attach cover plate after wiring. An additional single gang junction box for the test switch/normal power indicator
light will need to be provided by other. See mounting template on Page 3.
2. WIRING
Refer to the wiring diagram on the back page. Install in accordance with the National Electrical Code-
and local regulations. For additional wiring diagrams consult Customer Service.
3. INSTALLING THE AC INDICATOR
Mount the supplied 4-wire illuminated test switch in a location that is visible and accessible by maintenance personnel.
The switch mounts through a 1/2" hole which may need to be added to the luminaire or could come pre-punched by
the luminaire supplier.
For the single conduit (-C) models, add an additional single junction box for the test switch indicator light wall plate.
Wire the test switch per wiring diagrams provided on these instructions.
If wired correctly, the test switch indicator light should be “ON” when normal AC power is supplied to the fixture.
Pushing the test switch in normal power condition will turn on the emergency luminaire(s) whether the wall switch
is on or off.
Page 2
(Bottom Mount)