Chapter 5: Monitoring and Managing
73
You can monitor Migration progress on the Logical Drive Migration tab. Click the
respective buttons to pause and resume the Migration.
Scheduled
To schedule a Migration:
1. Click Logical Drive View in Tree View.
2. Click the Logical Drive you want to migrate.
3. Click the Migration tab in Management View.
4. From the Migrate RAID Level to dropdown menu, choose the target RAID
level for your logical drive.
5. If your intended action requires additional physical drives, click a Single Disk
(unassigned physical drive) to select it.
Available drives have a white frame. Selected drives have a red frame.
6. Click the Enable option.
7. From the dropdown menus, select a start time.
Start time is based on a 24-hour clock.
8. Click in Start At field to display a popup calendar.
9. Click the start date in the calendar or enter a date manually.
10. Click the Schedule button.