Product manual
EAP01 - Product Manual
7.2.2 Power Supply via Signal Terminal
Power the EAP01 on or off by connecting or disconnecting the power supply wiring from DIN rail terminal 5
as shown in Figure 17. Alternatively where the installation permits, powering on or off can be done by
connecting or isolating the power using the fused DIN rail terminals at the equipment rack.
L
The power supply connection is via a signal terminal as standard on EAP01 Build Standard
versions < 4A.
Figure 17 Power Supply via Signal Terminal
BACK BOX
+24 V INPUT – TERMINAL 5
POWER ON: CONNECT THE WIRING ON THE
EAP01 SIDE OF THE TERMINAL.
POWER OFF: DISCONNECT THE WIRING ON THE
EAP01 SIDE OF THE TERMINAL.
USE AN INSULATED SCREWDRIVER.
!
!
FIELD CABLING
Issue: 02 complete, approved
Page 37 of 52