Product manual
EAP01 - Product Manual
8. Feed the installation cables into the unit through the cable glands or conduit.
Figure 7 gives an indication of the length of the cable required for connection within the EAP01.
Figure 7 DIN Rail Terminal Position
BACK BOX
A
PPROX. 250 MM
A
PPROX. 250 MM
9. Seal the mounting holes and cable entry points.
• Ensure that mounting holes and cable entry points are adequately sealed to
preserve the unit’s IP rating.
• A drainage hole is provided on the bottom of the back box as standard on EAP01
Version 5 or later. This hole should also be sealed only if the cable entry is through
the bottom of the back box.
10. Connect the field cabling to the DIN rail.
Refer to Section “4.1 DIN Rail Terminal Allocation” (page 19).
For EMC compliance ensure that:
• All field cabling screens are connected to the back box. This should be via the DIN
rail SCREEN terminal.
• All screen tails are <3 cm.
!
!
!
!
11. Ensure all swarf is removed from the enclosure.
Issue: 02 complete, approved
Page 16 of 52