Product manual
EAP01 - Product Manual
4. Drill holes in the back box for cable gland or conduit entry and wall mounting, according to the
particular installation conditions.
a. Wall mounting holes: refer to Figure 22 for EAP01 mechanical dimensions.
b. Cable gland or conduit entry holes: observe the following recommendations.
• The EAP01 is designed for top or bottom entry of cables.
The recommended cable gland or conduit entry hole positions are shown in Figure 6.
Please refer to Application Solutions (Safety and Security) Ltd. if a different cable
entry positioning is required.
• Ensure that chosen cable entry locations and routing will not cause fouling when the
front panel is refitted.
!
!
Figure 6 Recommended Positioning of Cable Glands or Conduits on the Top or Bottom
150 mm
REAR
100 mm
50 mm
25 mm
FRONT
TOP OR BOTTOM OF UNIT
5. Deburr all newly drilled holes in order to prevent any damage to the cabling.
6. Mount the back box on the wall.
7. Ensure that the power supply from the central equipment rack, or wall-mount Intellevac DAU or ACU is
turned off.
Issue: 02 complete, approved
Page 15 of 52