Long before you moved into your home at Fitzsimmons Walk, the construction process involving 
numerous  craftsmen  and  hundreds  of  different  materials  was  underway.    We  believe  that  the 
homeowner should be aware of some of the interesting processes that went into each home. 
Variations 
Products  used  during  the  construction  process  may  change  due  to  circumstances  beyond  the 
Developer’s  control.    For  example,  variations  in  products  may  occur  as  a  result  of 
supplier/assembly line changes, industry changes, and procurement changes. In all instances, as 
required by your purchase agreement, any substitution of method or product shall be of equal or 
better quality than  the  original  specification.    These  changes  may  lead  to  variations  within the 
same type of unit. 
Variations  within  the  same  type  of  unit  will  also  occur  if  the  purchaser  elected  to  pay  for  an 
upgrade option.  
Quality Assurance Program 
The Developer strives to produce the highest possible caliber of home.  The Developer’s “Quality 
Assurance Program” places company representatives on-site during the construction process to 
review every stage and report on any deficiencies they may find.  The goal of this program is to 
identify  problems  before they are  passed  over  to  the  next  stage  in  construction.   The  “Quality 
Assurance Program” endeavors to minimize deficiencies present at the time your take possession 
of your new home. 
Delivery Date 
The delivery date for your home (the date the unit is transferred from the Developer to the first 
homeowner) begins  as an estimate.    Until components  are completed and  the  structure is 
enclosed, this delivery date can be dramatically affected by weather conditions and the availability 
of labour and materials.  Even after the home itself is past weather-related delay potential, the 
installation of utility services, final grading, concrete flatwork, etc. can still affect the delivery date. 
City occupancy permits are acquired once these elements are complete.  Please understand that 
the trades are as eager as you to get caught up and deliver your home on time. 
**  Depending  on  availability  of  labour  and  materials,  weather  conditions,  site  conditions  and  the 
construction process, some homes may not be completed by their scheduled delivery dates ** 