Figure 11. LED2 deployment indications.
11 Use the GUI web interface on base station B and check the signal strength on the
actual synchronization coverage and name it X.
12 Perform an RFP scan. If there are other DECT systems that are stronger than (X-6)
dBm, move base station B closer to base station A and then repeat from step 10
above. For example, if
X = -80 dBm then there must be no other DECT systems that are stronger than -86
dBm.
8.4 To perform measurements for other base stations
13 Move base station A to the position where base station B is located.
14 Place base station B on the next planned position.
15 Repeat from step 7 above.
ms 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
1,2 sec
A
B
C
A = Good sync coverage
B = Inadequate sync coverage
C = No sync coverage
Green
Yellow
Red