Product manual
Installation instructions, CPU2 cabling
Technical Product Manual - DCT1800-GAP
TD 92093 (1/LZBNB 103 108 R4D) / 2006-03-09/ Ver.C
© 2006
123
Chapter 21 CPU2 cabling
21.1 Introduction
This chapter describes all cabling to the CPU2. All cabling of the CPU2 is routed via the MCCB.
21.2 Installation
Connections from CPU2 to MCCB
1. Remove the tie-wrap which is holding together cable the CPU/MCCB serial connection cable
(TSRNB 101 26) and the general alarm cable (TSRNB 101 28). Both cables are already connected
to one side of the MCCB.
2. Connect the CPU/MCCB serial connection cable (TSRNB 101 26) to the printer and PC port on
the CPU (see fig
84).
3. Connect the general alarm cable (TSRNB 101 28) to the general alarm port on the CPU2.
Connections to PC (CSM-DOS, modem shell, etc.) and printer
1. Connect PC cable REX-CAB9011 (TSRNB 101 22) between the PC connector on the MCCB and
the PC.
2. Connect the printer cable REX-CAB9012 (TSRNB 101 23) between the PR connector on the
MCCB and the printer.
3. Fasten the cables to the cable tie blocks on the ground strip (see figure 85) using tie wraps.
Connection to PC (Messaging and CTI applications)
1. Connect the PC cable REX-CAB9011 (TSRNB 101 22) between the PR connector on the MCCB
and the PC with the CTI applications.
WARNING
The printer and PC must be stationed in a restricted area if connected
directly to the modular cabinet
The printer and PC must be connected to mains with a suitable socket;
safety earth to safety earth, non-earth to non-earth (the safety earth
must be guaranteed).