Product manual

Installation instructions, Cell Link Unit-S (CLU-S) – REX-BRD0016 (ROFNB 157 16/2)
Technical Product Manual - DCT1800-GAP
TD 92093 (1/LZBNB 103 108 R4D) / 2006-03-09/ Ver.C
© 2006
49
Fig. 28 Power distribution on CLU-S
10.3 Installation
1. Insert the CLU-S into the slides of its specified slot position.
2. Gently push the board into the back connector till it locks. Don’t use excessive force.
Note: Since the base stations must be initialized connected to one CLU board at the time, it is
recommended to start with inserting only one CLU board at the first installation. When the connected
base stations have been initialized, the second CLU board can be inserted and base stations initialized,
etc.
Note:
See also chapter 22, ‘CLU/CLU-S/SLU to base station cabling’.
027
Base station 8
CLC 8
P0
P1
SC0
SC1
CLC 1
SC0
SC1
EPP
Base station 1
Power from
connection
board
CLU-S
EPP
+T
+T
+T
+T