Installation guide
Page 2-4
Installation
Installing the Hub
The following instructions explain how to install the 1016-IQ Hub.
1
Make sure the AC power switch is in the OFF position.
2
Plug the power cord into the power socket at the rear panel
of the hub.
3
Plug the other end of the power cord into a wall outlet or
other source of power.
4
Turn the power switch to the ON position.
The PWR LED lights.
5
Plug one end of a twisted-pair network cable into one of
the RJ-45 jacks marked 1 to 16 on the front panel.
6
Plug the other end into an active workstation.
If the hub is to be connected to the existing thin-Ethernet
cable at either end of the segment, you can use the internal
terminator by placing the terminator switch to the INT
position.
If the BNC port is to be positioned at any point of the thin-
cable Ethernet segment, but not at the two ends, you can
turn the terminator switch to the EXT position and attach a
BNC-T connector to the BNC port.
If the hub is to be connected to an existing thick-Ethernet
cable, an external transceiver or an MAU, should be
attached to the AUI port on the hub.
If the hub is to be mounted to the 19” rack, install rack
mount ears by tightening the screws, and mount the hub
on the rack.
If a second hub is to be linked together, move the OFF/ON
switch to the ON position, connect the cable to the six-
teenth port, and to any port on the second hub.
7
If you are not using an SNMP Management package, you
have completed installing the hub.
If you are using an SNMP Management package, continue
the IP installation described in chapter 3.