Setup guide

3
FriendlyNET FM2008/2009 SNMP/Web Managed Switches
Quick Start Guide
Follow these steps to install your switch:
1. Open the box and check the contents. See Chapter 1 for a complete
list of the items included with your switch.
2. Install the switch in an equipment or wall rack, or prepare it for
desktop placement.
3. Connect the power supply.
4. Connect network devices to the switch.
5. Refer to the User’s Manual on the accompanying CD-ROM for
configuration and management capabilities.
For more information on installing the switch, please refer to Chap-
ter 2.