Specifications
Gas
Deliver
This Expansion Kit enables reactions and concentrations to be carried out
on all twenty reaction vessels in the Quest
210
synthesizer. It consists of
a
Gas Delivery Manifold and a Solvent Trap Manifold with the necessary
lines and fittings. It should be installed only after the original GRCM
components, including the Control Box, have been properly installed.
1.
Connect the Gas Delivery Manifold Line (Part Number
300794)
to Outlet
2
of
the GRCM Control Box. Remove the plug on the other outlet of the GRCM
Control Box, if it is present.
2.
Attach the other end of the line to the gas inlet of the Gas Delivery Manifold
of the Expansion Kit.
3.
Attach the Gas Delivery Manifold to the Lower Manifold Luers for the
appropriate reaction bank.
Solvent
Trap
Manifold
If you are carrying out concentration, install the Solvent Trap manifold as
follows:
1.
Remove the luer plugs from the Upper Manifold of the appropriate reaction
bank.
2.
Align the male fittings of the Solvent Trap Manifold with the Upper Manifold
ports and seat it onto the upper manifold.
3.
Connect one end of the
%
inch Tygon tubing (Part number 103954) to the
barbed outlet fitting of the Solvent Trap Manifold, and connect the other
end to the user-supplied vapor trap.
4.
Use the needle valves to control gas flow to each bank of Reaction Vessels.
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










