User`s manual
Page 8 · 4200 Series LaserSource User’s Manual
100V Setting 120V Setting
230V Setting 240V Setting
Reinsert the voltage selector and replace the fuse cover.
Powering Up the Unit
Once the correct voltage selection has been made, connect the AC power cord
to the unit. You must properly ground the unit by plugging the supplied power
cord into a three prong grounded outlet, or using a three-to-two prong adapter
and connecting the ground tab to earth ground.
Turn the power switch, located on the IPC, into the on (|) position. The unit will
display the model, serial number, and firmware version, go through a quick
power-up self-test, and return to the last known operating state.